| Treatability Study |
| Treatability Workplan |
Publication Date |
File Size |
| DTSC Comments on the DOE Draft Monitored Natural Attenuation Evaluation Sampling and Analysis Plan |
February 2026 |
392 KB |
| DOE Revised Final In Situ Biological and Chemical Reduction Pilot Test Work Plan for the Hazardous Material Storage Area |
August 2025 |
26.5 MB |
| DOE Draft Monitored Natural Attenuation Evaluation Sampling and Analysis Plan_July 2025 |
July 2025 |
16.1 MB |
| NASA Alfa Area Enhanced In Situ Bioremediation (EISB) Well Installation and Baseline Sampling Report |
November 2024 |
79.7 MB |
| Final In Situ Biological and Chemical Reduction Pilot Test Work Plan for the Hazardous Material Storage Area |
December 2023 |
20.6 MB |
| DOE Responses to DTSC Comments on the In Situ Biological and Chemical Reduction Pilot Test Work Plan for the Hazardous Material Storage Area |
June 2023 |
152 KB |
| Draft In Situ Biological and Chemical Reduction Pilot Test Work Plan for the Hazardous Material Storage Area |
December 2022 |
7.5 MB |
| Enhanced In Situ Bioremediation (EISB) Pilot Study Work Plan (NASA) |
October 2020 |
12.0 MB |
| Conditional Approval of the Bedrock Vapor Extraction Treatability Study |
June 2014 |
2.0 MB |
| Letter from Roger Paulson, DTSC to Michael Bower, Boeing re: Approval to Proceed with the In-Situ Chemical Oxidation Field Experiment |
September 2013 |
415 KB |
| ISCO Monitoring Program Approval Letter |
July 2013 |
289 KB |
| ISCO Field Experiment Work Plan Approval Letter |
May 2013 |
1.1 MB |
| Preliminary Summary of Pre-injection Drilling and Testing Phase, In Situ Chemical Oxidation Field Experiment, Dated May 3, 2013 (Submitted as Draft, accepted as Final) |
May 2013 |
3.6 MB |
| Letter from Roger Paulson, DTSC to Michael Bower, Boeing re: In Situ Chemical Oxidation Field Experiment - Pre-Injection Drilling and Testing Schedule |
October 2012 |
269 KB |
| Letter from Michael O. Bower, Boeing to Mark Malinowski, DTSC re: In Situ Chemical Oxidation Field Experiment - Pre-Injection Drilling and Testing Schedule |
September 2012 |
218 KB |
| Work Plan Addendum # 1 - In Situ Chemical Oxidation Field Experiment |
September 2012 |
1.5 MB |
| Treatability Study Work Plan Addenda for the Santa Susana Field Laboratory |
January 2012 |
4.7 MB |
| Treatability Study Workplans |
June 2009 |
9.1 MB |
|
| References |
Publication Date |
File Size |
| MS Thesis - New Opportunities for Groundwater Hydrochemistry and Degradation Investigations Provided by the Snap Sampler® - by Laura K. Zimmerman |
August 2010 |
18.5 MB |
| Dissertation - Laboratory Evaluation of Chlorinated Ethene Transformation Process in Fractured Sandstone - by Ramona Darlington |
May 2008 |
1.4 MB |
| MS Thesis - Isotopic and Hydrogeochemical Investigation of Major Ion Origin and Trichloroethene Degradation in Fractured Sandstone - by Amanda Alice Pierce |
May 2005 |
19.5 MB |
| MS Thesis - Rock Core Investigation of DNAPL Penetration and Persistence in Fractured Sandstone - by Jennifer Catherine Hurley |
May 2003 |
39.4 MB |
|
| Correspondence |
Publication Date |
File Size |
| DTSC Comments on the Draft Technical Memorandum - Estimated Natural Organic Material Levels in Soil at the Santa Susana Field Laboratory |
January 2025 |
225 KB |
| DTSC Response Letter on the Draft In-Situ Biological and Chemical Reduction Pilot Test Work Plan for the HMSA |
August 2023 |
166 KB |
| DTSC Comments on the Draft In Situ Biological and Chemical Reduction Pilot Test Work Plan for the Hazardous Material Storage Area |
April 2023 |
456 KB |
| DTSC Responses to Boeing June 12, 2018 Responses to DTSC Comments (Dated February 7, 2018) on the Final Report of Results for the In Situ Chemical Oxidation Field Experiment, Ventura County, California |
March 2019 |
1.4 MB |
| Bedrock Vapor Extraction Relocation Approval Letter |
January 2013 |
377 KB |
| Treatability Study Response to Comments |
December 2012 |
1.7 MB |
| Letter from Michael O. Bower, Boeing to Mark Malinowski, DTSC re: In Situ Chemical Oxidation Field Experiment - Pre-Injection Drilling and Testing Schedule |
September 2012 |
71 KB |
| Letter from Michael O. Bower, Boeing to Mark Malinowski, DTSC re: DTSC Comments on the Draft In-Situ Chemical Oxidation Work Plan Addendum |
September 2012 |
1.9 MB |
| Letter from Roger Paulson/DTSC to Michael Bower/Boeing Regarding Approval to Procede with Four Laboratory Treatability Studies for Chatsworth Operable Unit Media |
December 2011 |
487 KB |
| Boeing Responses to DTSC Comments - Treatability Study Work Plan |
November 2011 |
1.7 MB |
| Letter from Mark Malinowskj/DTSC to Michael Bower/Boeing Regarding DTSC Approval of Treatability Study Work Plan for Chatsworth Operable Unit Media |
April 2011 |
2.3 MB |
|
| NASA123 |
Publication Date |
File Size |
|