| Treatability Reports |
| |
Publication Date |
File Size |
| DTSC Approval of NASA's Responses to DTSC Comments and Alfa Area Bedrock Vapor Extraction Pilot Study Report - End of Study |
October 2026 |
397 KB |
| DTSC Comments on NASA Bedrock Vapor Data Gap Investigation Report - Bravo and Delta Areas |
September 2026 |
520 KB |
| NASA Responses to DTSC Review Comments on the NASA Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study Report |
July 2026 |
381 KB |
| DTSC Approval of Boeing Bedrock Vapor Extraction Pilot Study Report, Component Test Laboratory III and Addendum to the Bedrock Vapor Extraction Pilot Study Report (April 1, 2026) |
June 2026 |
379 KB |
| DTSC Review of NASA's Alfa Area Bedrock Vapor Extraction Pilot Study Report - End of Study |
May 2026 |
381 KB |
| DTSC Approval of the Alfa Area Enhanced In Situ Bioremediation Pilot Study Performance Monitoring Report - Final Report |
May 2026 |
320 KB |
| NASA Alfa Area Enhanced In Situ Bioremediation Pilot Study Performance Monitoring Report – Final Report (April 2026) |
April 2026 |
50.2 MB |
| Boeing Addendum to the Bedrock Vapor Extraction Pilot Study Report, Component Test Laboratory III |
April 2026 |
276.0 MB |
| DTSC Comments on the NASA Alfa Area Enhanced in Situ Bioremediation Pilot Study Performance Monitoring Report - Final Report |
March 2026 |
582 KB |
| DTSC Approval of the Boeing Final Soil Vapor Extraction Pilot Study Report, Instrument and Equipment Laboratory |
February 2026 |
669 KB |
| DTSC Comments on the Boeing Bedrock Vapor Extraction Pilot Study Report for the Component Test Laboratory III (CTL-III)RFI Site |
December 2025 |
940 KB |
| Boeing Final Soil Vapor Extraction Pilot Study Report, Instrument and Equipment Laboratory |
December 2025 |
33.2 MB |
| DTSC Comments on the Soil Vapor Extraction Pilot Study Report, Instrument and Equipment Laboratory (IEL) |
November 2025 |
429 KB |
| NASA Groundwater Corrective Measures Study Remedy Implementation Program, Alfa Area Bedrock Vapor Extraction Pilot Study Report, End of Study (September 2025) |
September 2025 |
204.0 MB |
| NASA Alfa Area Enhanced In Situ Bioremediation Pilot Study Performance Monitoring Report – Final Report |
July 2025 |
49.7 MB |
| Boeing Bedrock Vapor Extraction Pilot Study Report |
July 2025 |
73.7 MB |
| Boeing Soil Vapor Extraction Pilot Study Work Plan, Instrument and Equipment Laboratory (IEL) |
April 2025 |
33.6 MB |
| DOE Estimated Natural Organic Material Levels in Soil at the Santa Susana Field Laboratory, |
November 2024 |
432 KB |
| DTSC Approval of the NASA Alfa Area Bedrock Vapor Extraction Pilot Study Report: Startup Through Six Months of Operations |
October 2024 |
144 KB |
| NASA's Alfa Area Enhanced In Situ Bioremediation Pilot Study Performance Monitoring Report - October 2023 to March 2023 |
October 2024 |
82.6 MB |
| NASA Alfa Area Bedrock Vapor Extraction Pilot Study Report Startup through Six Months of Operations |
January 2024 |
162.6 MB |
| NASA's Alfa Area Enhanced In Situ Bioremediation Pilot Study Implementation Report |
December 2023 |
105.1 MB |
| NASA's Alfa Area Enhanced In Situ Bioremediation Well installation and Baseline Report |
November 2023 |
79.7 MB |
| Final White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents |
July 2018 |
6.6 MB |
| Boeing Responses to DTSC Comments on the Final Report of Results for the In-situ Chemical Oxidation Field Experiment for SSFL |
June 2018 |
920 KB |
| Letter from Julie Lincoln/DTSC to the Responsible Parties re: Review of Responses to DTSC Comments and the Revised Draft White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents for SSFL |
February 2018 |
2.0 MB |
| Letter from Julie Lincoln/DTSC to the Responsible Parties re: Review of Responses to DTSC Comments on the Final Report of Results for the In-situ Chemical Oxidation Field Experiment for SSFL |
February 2018 |
1.6 MB |
| Draft White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents |
September 2017 |
7.3 MB |
| Responses to DTSC Comments on the Draft White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents |
September 2017 |
209 KB |
| Final Report Laboratory Evaluation of Biostimulation to Treat Chlorinated Ethenes in the Chatsworth Formation |
July 2017 |
8.1 MB |
| Laboratory Evaluation of Biostimulation to Treat Chlorinated Ethenes in the Chatsworth Formation |
July 2017 |
8.1 MB |
| DTSC Comments Final Report of Results for the In-Situ Chemical Oxidation Field Experiment |
June 2017 |
582 KB |
| DTSC Comments Technical Memorandum: Results from Bravo Bedrock Vapor Extraction Treatability Study |
October 2016 |
978 KB |
| DTSC Comments Draft White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents |
October 2016 |
760 KB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendices A-G combined |
June 2016 |
7.2 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendices H-K combined |
June 2016 |
18.9 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendices L-N combined |
June 2016 |
20.0 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendix A-G combined |
June 2016 |
7.2 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendix O-Data Trend Plots-Metals Reduced |
June 2016 |
12.6 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendix P - 2 of 2 & Appendix Q |
June 2016 |
26.6 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Appendix P-Data Trend Plots-General Chemistry 1 of 2 |
June 2016 |
23.8 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures 8-1 to 9-10 |
June 2016 |
5.6 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures 9-11 to 9-13 |
June 2016 |
17.1 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures 9-14 to 9-15 |
June 2016 |
12.8 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures 9-16 to 9-18 |
June 2016 |
13.6 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures 9-19 to 10-1 |
June 2016 |
7.7 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Figures ES 1 to 5-1 |
June 2016 |
5.5 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Text & Tables |
June 2016 |
4.9 MB |
| Final Report of Results, In Situ Chemical Oxidation Field Experiment, Uncertainties Memo - Revision 1 |
June 2016 |
26.6 MB |
| Draft White Paper on Thermal Remediation Technologies for Treatment of Chlorinated Solvents |
April 2016 |
7.1 MB |
| Technical Memorandum: Results from Bravo Bedrock Vapor Extraction Treatability Study |
November 2015 |
2.6 MB |