Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

Corrective Measure Study & Remedy Selection

Corrective Measures Study Report
  Publication
Date
File Size
DTSC Letter to Boeing Regarding a Schedule Extension for DTSC Review of Boeing’s Final Groundwater CMS Report and Release of the DTSC Draft Groundwater Statement of Basis May 2026 368 KB
NASA Final Phase 1 Groundwater CMS Report December 2025 78.0 MB
DTSC Comments on DOE Leachate Modeling Results August 2025 340 KB
Regional Water Board Review of RCRA Limited SMOU CMS Report June 2025 1.5 MB
DTSC Conditionally Complete Determination on the Boeing Company's Final RCRA Limited Corrective Measures Study Report, Surficial Media Operable Unit, Boeing RFI Subareas May 2025 224 KB
Boeing Final Draft SMOU CMS April 2025 153.0 MB
DTSC and Water Board Comments on Boeings Draft SMOU CMS March 2025 969 KB
Boeing Draft SMOU CMS-2 APP D Summary Intro and APP D.1 January 2025 9.6 MB
Boeing Draft SMOU CMS-3 Appendix D.3 December 2024 25.5 MB
Boeing Request for Schedule Extension for the Groundwater Corrective Measures Study Report December 2024 606 KB
Boeing Request for Schedule Extension for the Surficial Media Operable Unit (SMOU) Corrective Measures Study Report December 2024 827 KB
Boeing Request for Schedule Extension, Surficial Media Operable Unit Corrective Measure Study December 2024 217 KB
Boeing Request for Schedule Extension, Groundwater Corrective Measure Study November 2024 217 KB
DTSC Approval of Boeing's Extension request for Corrective Action Schedule_10/2024 October 2024 2.2 MB
Boeing Draft SMOU CMS-1 Text, Tables, Figures, Appendices A, B, and C October 2024 30.2 MB
Boeing Draft SMOU CMS-4 Appendices E, F, and G October 2024 6.0 MB
DTSC Response to The Boeing Company's Request for Schedule Extension, Groundwater Corrective Measures Study, Santa Susana Field Laboratory, Ventura County, California September 2024 287 KB
Request for Schedule Extension, Boeing Groundwater Corrective Measure Study, Santa Susana Field Laboratory, Ventura County, California September 2024 215 KB
DTSC and Los Angeles Regional Water Board Comments on the Boeing Company’s Draft RCRA Corrective Measures Study Report – Vadose Zone Bedrock and Groundwater of the Surficial Media and Chatsworth Formation Operable Units for the Santa Susana Field Laboratory September 2024 10.0 MB
NASA ND-169 Groundwater Extraction and Treatment System Testing September 2024 28.3 MB
Draft Final NASA Phase 1 Groundwater CMS August 2024 77.2 MB
Draft Boeing Resource Conservation and Recovery Act Corrective Measures Study Report – Vadose Zone Bedrock and Groundwater of the Surficial Media and Chatsworth Formation Operable Units, Santa Susana Field Laboratory, Ventura County, California (Part 1 – Text, Tables, and Figures) June 2024 97.8 MB
Draft Boeing Resource Conservation and Recovery Act Corrective Measures Study Report – Vadose Zone Bedrock and Groundwater of the Surficial Media and Chatsworth Formation Operable Units, Santa Susana Field Laboratory, Ventura County, California (Part 2 – Appendices) June 2024 228.0 MB
Final RCRA Limited Corrective Measures Study Work Plan Addendum, Surficial Media Operable Unit, Boeing RFI Subareas June 2023 5.1 MB
DTSC Approval of DOE CMS Comment Extension Request October 2022 269 KB
DTSC Comments on NASA LOX Bedrock Vapor Data Gap Investigation Report October 2022 154 KB
DTSC Comments On DOE Revised Groundwater CMS Report September 2022 544 KB
NASA Corrective Measures Implementation, Installation of ND-169, Part 1 of 2 August 2022 6.0 MB
NASA Corrective Measures Implementation, Installation of ND-169, Part 2 of 2 August 2022 28.9 MB
DTSC Approval of NASA Alfa Test Stand 2 Well Installation Workplan July 2022 145 KB
NASA Groundwater CMS LOX Bedrock Vapor Data Gap Investigation Report July 2022 15.0 MB
NASA Alfa Test Stand 2 Well Installation Work Plan April 2022 20.6 MB
Part 1 – Review of Draft NASA Phase 1 Groundwater Corrective Measures Study (Dated September 2020) – DTSC Comments August 2021 354 KB
Part 2 – Review of Draft NASA Phase 1 Groundwater Corrective Measures Study (Dated September 2020) – LARWQCB Comment Memo August 2021 423 KB
DOE Area IV Draft Final Groundwater Corrective Measures Study September 2020 44.7 MB
NASA Draft Phase 1 Groundwater Corrective Measures Study September 2020 65.4 MB
LARWQCB Comments on DOE Draft CMS Report April 2020 372 KB
Review of Draft NASA Groundwater CMS Report (August 2018) January 2020 1.1 MB
Review of Draft DOE Groundwater CMS Report (September 2018) July 2019 688 KB
DOE Area IV Draft Corrective Measures Study September 2018 18.2 MB
NASA Draft Groundwater Corrective Measures Study August 2018 23.5 MB
^Top^