DOCUMENT LIBRARY
SEARCH THE
DOCUMENT LIBRARY
Air Monitoring
Boeing
NASA
Public Involvement
Public Comment Documents
RCRA Facility Investigation – Soils
RCRA Facility Investigation - Groundwater
Corrective Measure Study & Remedy Selection
Corrective Measures Implementation
Chemical Background Study
California Regional Water Quality Control Board (RWQCB)
Senate Bill 990
Project Technical Meetings and Weekly Activity Reports
Quarterly Progress Reports
Surface Water
Interim Measures
Risk Assessment
California Environmental Quality Act (CEQA)
Physicians for Social Responsibility et al. v. DTSC
Department of Energy (DOE) Area IV
Offsite Investigations
Regulator Correspondence and Oversight
Permit-related Activities
Wildfires
Boeing Lawsuit
Aerial Photos
Photos
Maps
Look-Up Tables
Backfill Study and MRL Evaluation
Parents Against Santa Susana Field Laboratory et al. v. DTSC
Corrective Measure Study & Remedy Selection
Technical and Economic Feasibility Study Reports
Correspondence
Publication
Date
File Size
DTSC Conditional Approval of the Final Technical and Economic Feasibility Study Report for the Bowl RFI Site
July 2024
2.2 MB
DTSC Conditional Approval of the Final Technical and Economic Feasibility Study Report for the CTL-III RFI Site
July 2024
581 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Advanced Propulsion Test Facility (APTF) RFI Site
July 2024
1.1 MB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Happy Valley North RFI Site
July 2024
1.1 MB
DTSC Conditional Approval of the Final Technical and Economic Feasibility Study Report for the LETF/CTL-I RFI SIte
June 2024
491 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Instrument and Equipment Laboratory (IEL) RFI Site
June 2024
1.7 MB
DTSC Conditional Approval of the Final Technical and Economic Feasibility Study Report for the Environmental Chemistry Laboratory (ECL) RFI Site
June 2024
717 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Compound A RFI Site
June 2024
542 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Subarea 10 RFI Site
June 2024
1.2 MB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Bowl RFI Site
June 2024
185 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the CTL-III RFI Site
June 2024
198 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Environmental Effects Laboratory (EEL) RFI Site
June 2024
1.1 MB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Area III Sewage Treatment Plant (STP-III) RFI Site
June 2024
533 KB
DTSC Approval of the Final Technical and Economic Feasibility Study for the Silvernale RFI Site
June 2024
1.1 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the Bowl RFI Site
June 2024
1.5 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the CTL-III RFI Site
June 2024
1.6 MB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Canyon RFI Site
May 2024
188 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Happy Valley South RFI Site
May 2024
195 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the LETF/CTL-I RFI Site
May 2024
202 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Subarea 10 RFI Site
May 2024
179 KB
DTSC Conditional Approval of the Final Technical and Economic Feasibility Study Report for the R-1 Pond RFI SIte
May 2024
672 KB
DTSC Approval of the Final Technical and Economic Feasibility Study Report for the Area I Landfill (AILF) RFI SIte
May 2024
518 KB
DTSC Comments on the Technical and Economic Feasibility Study Report for the Canyon RFI SIte
May 2024
823 KB
DTSC Comments on the Technical and Economic Feasibility Study Report for the Happy Valley South RFI SIte
May 2024
965 KB
DTSC Comments on the Technical and Economic Feasibility Study Report for the LETF/CTL-I RFI SIte
May 2024
1.5 MB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Advanced Propulsion Test Facility RFI Site
April 2024
202 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Building 359 RFI Site
April 2024
205 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Compound A Facility RFI Site
April 2024
205 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Happy Valley North RFI Site
April 2024
217 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Engineering Chemistry Laboratory (ECL) RFI Site
April 2024
204 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Environmental Effects Laboratory (EEL) RFI Site
April 2024
201 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Instrument and Equipment Laboratory (IEL) RFI Site
April 2024
195 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Area III Sewage Treatment Plant RFI Site
April 2024
201 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Silvernale RFI Site
April 2024
203 KB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the Subarea 10 RFI Site
April 2024
1.6 MB
oeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Systems Test Laboratory IV RFI Site
April 2024
189 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the B-1 Test Area (B-1) RFI Site
April 2024
197 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the CTL-V RFI Site
April 2024
207 KB
Boeing Response to DTSC and Regional Board Comments on the Final Technical and Economic Feasibility Study for the Area I Landfill RFI Site
April 2024
212 KB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the Happy Valley North RFI Site
April 2024
1.4 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the Compound A RFI Site
March 2024
1.8 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the APTF RFI Site
March 2024
1.6 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the EEL RFI Site
March 2024
1.5 MB
DTSC Approval of the Final Technical and Economic Feasibility Study Report for the Area I Burn Pit RFI Site
March 2024
526 KB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the B-359 RFI Site
March 2024
1.5 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the ECL RFI Site
March 2024
1.7 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the IEL RFI Site
March 2024
1.9 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the Silvernale RFI Site
March 2024
1.6 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the STP-III RFI Site
March 2024
1.6 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the AILF RFI Site
March 2024
1.7 MB
DTSC Revised Comments on the Boeing Final T&E Report for the B-1 RFI Site
March 2024
1.9 MB
DTSC Updated Comments on the Final Technical and Economic Feasibility Study Report for the CTL-V RFI Site
March 2024
1.7 MB
DTSC Comments on the Final Technical and Economic Feasibility Study Report for the STL-IV RFI Site
March 2024
1.1 MB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the Bowl RFI Site
March 2024
633 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the R-1 RFI Site
March 2024
720 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the Perimeter Pond RFI Site
February 2024
688 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the CTL-III RFI Site
February 2024
655 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the Canyon RFI Site
January 2024
768 KB
DTSC Comment Letter on the Draft Technical and Economic Feasibility Study Report for the LETF/CTL-I RFI Site
January 2024
356 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the Happy Valley South (HVS) RFI Site
January 2024
559 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for Subarea 10
January 2024
780 KB
DTSC and LARWQCB Response to Boeing's RTC on the Final B-1 T&E Report
January 2024
1.9 MB
DTSC Revised Comments on the Boeing Final T&E Report for the B-1 RFI Site
January 2024
1.9 MB
DTSC and LARWQCB Response to Boeing's RTC on the Final T&E Report for the AILF RFI Site
December 2023
1.8 MB
DTSC Comments on the Draft Technical and Economic Feasibility Study Report for the Happy Valley North RFI Site
December 2023
357 KB
DTSC and LARWQCB Response to Boeing's RTC on the Final T&E Report for the CTL-V RFI Site
December 2023
1.8 MB
DTSC and LARWQCB Response to Boeing's RTC on the Final T&E Report for the AIBP RFI Site
December 2023
1.6 MB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Building 359 RFI Site
December 2023
704 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Advanced Propulsion Test Facility (APTF) RFI Site
November 2023
763 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the System Test Laboratory (STL-IV) RFI Site
November 2023
656 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Compound A RFI Site
November 2023
627 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Sewage Treatment Plant (STP-III) RFI Site
October 2023
538 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Sewage Treatment Plant-III (STP-III) RFI Site
October 2023
538 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Enviornmental Effects Laboratory RFI Site
October 2023
434 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for the Silvernale RFI Site
October 2023
626 KB
DTSC Comments on the Draft Technical and Economic Feasibility Study for 5/9 North, Engineering Chemistry Laboratory RFI Site
October 2023
561 KB
DTSC COMMENTS ON THE DRAFT TECHNICAL AND ECONOMIC FEASIBILITY STUDY FOR INSTRUMENT AND EQUIPMENT LABORATORY RFI SITE
September 2023
598 KB
DTSC Comments on the Boeing Draft T&E Report for the Area I Landfill
August 2023
530 KB
DTSC Comments on the Boeing Draft T&E for the B1 RFI Site
August 2023
576 KB
Technical and Economic Feasibility Study Protocol for Boeing Areas of Responsibility
August 2023
828 KB
DTSC Comments on Boeing’s AIBP T&E Feasibility Study Report
June 2023
2.5 MB
DTSC Comments on Boeing’s CTL-V T&E Feasibility Study Report
June 2023
5.7 MB
Reports
Publication
Date
File Size
Final Technical and Economic Feasibility Study for the R-1 Pond RFI Site
April 2024
26.3 MB
Final Technical and Economic Feasibility Study for the Bowl RFI Site
April 2024
23.5 MB
Final Technical and Economic Feasibility Study for the Canyon RFI Site
March 2024
25.0 MB
Final Technical and Economic Feasibility Study for the Component Test Laboratory III (CTL-III) RFI Site
March 2024
24.7 MB
Final Technical and Economic Feasibility Study for the Happy Valley South RFI Site
March 2024
26.3 MB
Final Technical and Economic Feasibility Study for the Laser Engineering Test Facility (LETF)/Component Test Laboratory I (CTL-I) RFI Site
March 2024
25.4 MB
Final Technical and Economic Feasibility Study for the Subarea 10 RFI Site
February 2024
14.8 MB
Final Technical and Economic Feasibility Study for the Happy Valley North (HVN)
January 2024
26.2 MB
Final Technical and Economic Feasibility Study for the Building 359 (B359) RFI Site
January 2024
24.7 MB
Final Technical and Economic Feasibility Study for the Advanced Propulsion Test Facility
December 2023
24.3 MB
Final Technical and Economic Feasibility Study for the System Test Laboratory IV (STL-IV)
December 2023
25.6 MB
Final Technical and Economic Feasibility Study for the Compound A RFI Site
December 2023
24.7 MB
Final Technical and Economic Feasibility Study for the Environmental Effects Laboratory
December 2023
24.3 MB
Final Technical and Economic Feasibility Study for the Area III Sewage Treatment Plant
December 2023
19.6 MB
Draft Technical and Economic Feasibility Study for the R-1 Pond RFI Site
December 2023
24.0 MB
Draft Technical and Economic Feasibility Study for the Bowl RFI Site
November 2023
22.7 MB
Final Technical and Economic Feasibility Study for the Silvernale RFI Site
November 2023
25.4 MB
Draft Technical and Economic Feasibility Study for the Perimeter Pond RFI Site
November 2023
17.4 MB
Final Technical and Economic Feasibility Study for the Environmental Chemistry Laboratory
November 2023
20.0 MB
Draft Technical and Economic Feasibility Study for the CTL-III RFI Site
November 2023
27.6 MB
Final Technical and Economic Feasibility Study for the Instrument and Equipment Laboratory
November 2023
30.2 MB
Draft Technical and Economic Feasibility Study for the Happy Valley South (HVS) RFI Site
November 2023
28.4 MB
Draft Technical and Economic Feasibility Study for the Canyon Engine Test Area (Canyon)
October 2023
26.9 MB
Draft Technical and Economic Feasibility Study for the Laser Engineering Test Facility
October 2023
27.8 MB
Final Technical and Economic Feasibility Study for the B1 RFI Site
October 2023
26.6 MB
Final Technical and Economic Feasibility Study for the Area I Landfill (AILF) RFI Site
October 2023
20.0 MB
Final Technical and Economic Feasibility Study for the Area I Landfill RFI Site
October 2023
20.0 MB
Draft Technical and Economic Feasibility Study for the Boeing RFI Subarea 10 Site
October 2023
15.5 MB
Draft Technical and Economic Feasibility Study for the Happy Valley North (HVN) RFI Site
September 2023
21.1 MB
Draft Technical and Economic Feasibility Study for the Building 359 (B359) RFI Site
September 2023
26.9 MB
Draft Technical and Economic Feasibility Study for the Advanced Propulsion Test Facility
September 2023
25.6 MB
Final Technical and Economic Feasibility Study for the Area I Burn Pit (AIBP) RFI Site
September 2023
28.3 MB
Final Technical and Economic Feasibility Study for the Component Test Laboratory V RFI
September 2023
29.1 MB
Draft Technical and Economic Feasibility Study for the System Test Laboratory IV (STL-IV)
August 2023
27.8 MB
Draft Technical and Economic Feasibility Study for the Compound A RFI Site
August 2023
21.5 MB
Draft Technical and Economic Feasibility Study for the Area III Sewage Treatment Plant
August 2023
19.2 MB
Draft Technical and Economic Feasibility Study for the Area III Sewage Treatment Plant (STP-3) RFI Site
August 2023
19.2 MB
Draft Technical and Economic Feasibility Study for the Environmental Effects Laboratory (EEL) RFI Site
August 2023
21.1 MB
Draft Technical and Economic Feasibility Study for the Silvernale RFI Site
July 2023
24.2 MB
Draft Technical and Economic Feasibility Study for the Environmental Chemistry Laboratory (ECL) RFI Site
July 2023
17.7 MB
Draft Technical and Economic Feasibility Study for the Instrument and Equipment Laboratory (IEL) RFI Site
July 2023
29.5 MB
Draft Technical and Economic Feasibility Study for the Area I Landfill RFI Site
June 2023
21.0 MB
Draft Technical and Economic Feasibility Study for the B-1 RFI Site
June 2023
28.5 MB
Draft Technical and Economic Feasibility Study for the Area I Burn Pit RFI Site
March 2023
29.7 MB
Draft Technical and Economic Feasibility Study for the Component Test Laboratory V RFI Site
March 2023
42.0 MB
^Top^
This page was last updated on 4/29/2009 | Copyright ©2006. All rights reserved.
All documents posted on this site can be viewed with Adobe Acrobat Reader