DOCUMENT LIBRARY
SEARCH THE
DOCUMENT LIBRARY
Air Monitoring
Boeing
NASA
Public Involvement
Public Comment Documents
RCRA Facility Investigation – Soils
RCRA Facility Investigation - Groundwater
Corrective Measure Study & Remedy Selection
Corrective Measures Implementation
Chemical Background Study
California Regional Water Quality Control Board (RWQCB)
Senate Bill 990
Project Technical Meetings and Weekly Activity Reports
Quarterly Progress Reports
Surface Water
Interim Measures
Risk Assessment
California Environmental Quality Act (CEQA)
Physicians for Social Responsibility et al. v. DTSC
Department of Energy (DOE) Area IV
Offsite Investigations
Regulator Correspondence and Oversight
Permit-related Activities
Wildfires
Boeing Lawsuit
Aerial Photos
Photos
Maps
Look-Up Tables
Backfill Study and MRL Evaluation
Parents Against Santa Susana Field Laboratory et al. v. DTSC
Corrective Measure Study & Remedy Selection
Workplan
Publication
Date
File Size
DTSC Comments on the NASA Former LOX Plant Area Bedrock Vaper Extraction Pilot Study Workplan
October 2023
247 KB
NASA Bravo Area Bedrock Vapor Extraction Data Gap Work Plan to Support Phase 1 Corrective Measures Design and Implementation Activities
August 2023
16.4 MB
DTSC Approval Letter of the Boeing RCRA Limited Corrective Measures Study Work Plan Addendum
August 2023
186 KB
NASA Baseline Vapor Sampling for the Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study
April 2023
15.9 MB
NASA Installation of Vapor Extraction Well NV-003 and Vapor Monitoring Wells NV-004 and NV-005 Technical Memorandum
March 2023
19.5 MB
Coca Plume Monitored Natural Attenuation Data Gap Well Installation Work Plan to Support Phase 1 Corrective Measures Design and Implementation Activities
February 2023
24.5 MB
RCRA Limited CMS Workplan Addendum, Surficial Media Operable Unit, for Boeing RFI Subareas
February 2023
4.8 MB
2023.01.27_DTSC Approval Letter for Boeings Final BVE Work Plan
January 2023
170 KB
DTSC Approval Letter for the Boeing Final Soil Vapor Extraction Pilot Study Work Plan, IEL
January 2023
198 KB
Boeing Final Soil Vapor Extraction Pilot Study Work Plan, Instrument and Equipment Laboratory (IEL)
December 2022
25.1 MB
Boeing CTL-III Bedrock Vapor Extraction Pilot Study Work Plan
September 2022
22.5 MB
NASA RTC on Alfa Well Installation Work Plan to Support Corrective Measure Design
June 2022
204 KB
DTSC Approval Letter of NASA Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study Work Plan
March 2022
123 KB
NASA Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study Work Plan
January 2022
32.4 MB
NASA CMS Delta Area Well Installation Workplan
February 2021
8.6 MB
Area IV Groundwater Corrective Measures Study Work Plan
February 2018
4.3 MB
NASA Feasibility Study Work Plan Addenda
September 2017
224 KB
Boeing CMS Work Plan Addendum for Vadose-Zone Bedrock and Groundwater Areas
August 2017
20.5 MB
Feasibility Study Workplan
April 2009
28.3 MB
^Top^
This page was last updated on 4/29/2009 | Copyright ©2006. All rights reserved.
All documents posted on this site can be viewed with Adobe Acrobat Reader