DOCUMENT LIBRARY
SEARCH THE
DOCUMENT LIBRARY
Air Monitoring
Boeing
NASA
Public Involvement
Public Comment Documents
RCRA Facility Investigation – Soils
RCRA Facility Investigation - Groundwater
Corrective Measure Study & Remedy Selection
Chemical Background Study
California Regional Water Quality Control Board (RWQCB)
Senate Bill 990
Project Technical Meetings and Weekly Activity Reports
Quarterly Progress Reports
Surface Water
Interim Measures
Risk Assessment
California Environmental Quality Act (CEQA)
Physicians for Social Responsibility et al. v. DTSC
Department of Energy (DOE) Area IV
Offsite Investigations
Regulator Correspondence and Oversight
Permit-related Activities
Wildfires
Boeing Lawsuit
Aerial Photos
Photos
Maps
Look-Up Tables
Backfill Study and MRL Evaluation
Parents Against Santa Susana Field Laboratory et al. v. DTSC
SEARCH THE DOCUMENT LIBRARY
Category:
Use this field to narrow your search by selecting a category from the Document Library, if known. Leave the
field blank if you're uncertain. If the field is left blank, the entire document library will be searched. If a category is selected in this field, only documents within this category will be searched.
AERIAL PHOTOS
Low Resolution Aerial Photos
High Resolution Aerial Photos
AIR MONITORING
Air Monitoring
Work Plan
BACKFILL STUDY AND MRL EVALUATION
Correspondence
Reports
Workplans
BOEING
Correspondence
Project Timeline
Sampling and Analysis Plans
BOEING LAWSUIT
Legal Documents
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
Closure Plans
Sitewide CEQA Documents
Available Background Information
Draft Program Environmental Impact Report – September 2017
References Used in Draft PEIR
- Chapter 2 Introduction
- Chapter 3 Project Description
- Chapter 3 Project Description Volume 2 Final Historical Site Assessment
- Chapter 4.1 Aesthetics
- Chapter 4.2 Air Quality
- Chapter 4.3 Biological Resources
- Chapter 4.4 Cultural Resources
- Chapter 4.5 Geology, Soils and Seismicity
- Chapter 4.6 Greenhouse Gas
- Chapter 4.7 Hazards and Hazardous Materials
- Chapter 4.8 Hydrology and Water Quality
- Chapter 4.9 Land Use and Planning
- Chapter 4.10 Noise
- Chapter 4.11 Transportation and Traffic
- Chapter 4.12 Utilities and Service Systems
- Chapter 4.13 Energy Consumption
- Chapter 5 Cumulative Impacts
- Chapter 6 Alternatives
- Chapter 7 Impacts Found Not to Be Significant
References Used in Response To Comments
- Chapter 6.1 Introduction
- Chapter 6.2 Master Responses
- Chapter 6.3 Other Responses
Final Program Environmental Impact Report – June 2023
- Final Program Environmental Impact Report – June 2023
- Final PEIR Findings and Certification
ISE Order CEQA Documents
Linkage Reports
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD (RWQCB)
Correspondence
ENTS
Interim Source Removal Action Work Plans & Reports
- Community Comments
- Work Plans
- Agency Review Comments
- Correspondence
- Reports
NPDES Monitoring Discharge Reports
- Monitoring Discharge Reports 2006
- Monitoring Discharge Reports 2007
- Monitoring Discharge Reports 2008
- Monitoring Discharge Reports 2009
- Monitoring Discharge Reports 2010
- Correspondence
- Monitoring Discharge Reports 2011
- Monitoring Discharge Reports 2012
- Monitoring Discharge Reports 2013
- Monitoring Discharge Reports 2014
Orders
Permits
Waste Discharge Requirements
CHEMICAL SOIL BACKGROUND STUDY
Workplan
- Workplan Agency Review Comments
- Laboratory Evaluation Package
- Workplan Correspondence
- Workplan
- Comments on May 2011 Drafts: Revised QAPP, Labs Tech Memo, Locations Addendum
- Stakeholder Comments on the August 2010 Workplan
- Responses to Comments: 5-2011 Drafts: Rev'd. QAPP, Labs Tech Memo, Loc. Addendum
- Responses to Stakeholder Comments on the August 2010 Workplan
- Laboratory Analytical Data
Correspondence
Frequently Asked Questions
Results Report
- Tables
- Figures
- Appendices
- Appendix F - Grain-Size Data
- Chemical Soil Background Study Report
- Appendix H - Additional Grain Size Data
- Appendix H - Lancaster Laboratories Level IV Data Packages
- Appendix H - Columbia Analytical Level IV Data Packages
- Appendix H - Original Laboratory EDD's
- Appendix H - Frontier Analytical Level IV Data Packages
- Appendix H - Validation Memos
- Public Comments and Responses
DTSC Field Audit
- DTSC-Conducted Field Audit – October 20, 2011
CORRECTIVE MEASURE STUDY & REMEDY SELECTION
Workplan
Correspondence
Treatability Study
- Correspondence
- References
- Treatability Workplan
- NASA123
Treatability Reports
Corrective Measures Study Report
Statement of Basis
Groundwater Focused Field Investigations
- DOE Focused Field Investigations
Groundwater Modeling
Technical and Economic Feasibility Study Reports
- Reports
- Correspondence
DEPARTMENT OF ENERGY (DOE) AREA IV
Chemical Co-Located Sampling
- Misc. Agency Correspondence
- Phase 1 and 2 Master Work Plan/Field Sampling and Analysis Plan and Related Documents
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 5C
- Phase I Co-Located Chemical Sampling Results
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 5A
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 5B
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 5D
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 6
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 7
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 8
- Co-Located Chemical Sampling Results Technical Memorandums - Subarea 3
- Co-Located Chemical Sampling Results Technical Memorandums - Sediments
- Co-Located Chemical Sampling Results Technical Memorandums – Northern Buffer Zone
Final EIS for Remediation of Area IV and the Northern Buffer Zone at SSFL
- Volume 2 – Appendices A through M
- Volume 1 – Chapters 1 through 14
- Correspondence
- Summary
- Volume 3 - Comment Response Document
- Records of Decisions
Draft EIS for Remediation of Area IV and the Northern Buffer Zone at SSFL
- Summary
- Volume 1 – Chapters 1 through 14
- Volume 2 – Appendices A through K
- Correspondence
Supplemental EIS for Remediation of Area IV and the Northern Buffer Zone at SSFL
EPA Background Radiological Study
Correspondence
Chemical Data Gap Investigation
- Phase 3 Master Work Plan/Field Sampling and Analysis Plan and Related Documents
- DOE 2008 Data Gap Analysis
- Misc. Agency Correspondence
- Phase 3 Chemical Data Gap Investigation Sampling Reports
Chemical Data Summary Report
EPA Area IV Survey
- Biological Reports
- Technical Documents
- Correspondence
- Maps
- Presentation
- Responses to EPA CERCLA 104(e) Requests
- Progress Reports
- Cultural Reports
- Gamma Scanning
- Geophysical
- Quality Assurance Project Plan
- Final Field Sampling Plan for Soil Sampling – March 5, 2012
- Soils – Plans - Round 1
- Soils – Plans - Round 2
- Final Radiological Characterization of Soils, Area IV & the Northern Buffer Zone - Dec. 2012
- Soils – Reports - Round 1
- Soils – Reports - Round 2
- Groundwater - Plans
- Groundwater - Reports
- Miscellaneous Plans and Reports
RMHF Complex Demolition
- Plans under DTSC review - review completed
- Correspondence
- DTSC-approved Plans
- DOE Supporting Documents
- SSFL RMHF Community Updates and Work Notices
2020 RMHF Consent Order
Site Environmental Reports
- Site Environmental Reports
Soil Treatability Studies
- Soil Treatability Study Evaluation Report
- Soil Treatability Study Master Work Plan and Associated Study Plans
- STIG Meeting Documents
Demolition of HWMF and Remaining Six DOE Buildings in Area IV
SETF Building 4024 Basement Demolition
- SETF Building 4024 Basement Demolition
INTERIM MEASURES
Building 203
- Work Plan
- Reports
- Correspondence
- Photos
Former Sodium Disposal Facility (FSDF)
- Work Plan
- Reports
- Correspondence
- Photos
Groundwater
- Work Plan
- Reports
- Correspondence
- Photos
Happy Valley Ordinance
- Work Plan
- Reports
- Correspondence
- Photos
Happy Valley Perchlorate
- Work Plans
- Reports
- Correspondence
- Photos
Interim Measures
Northern Drainage
- Correspondence
- Photos
- Reports
- Workplans
LOOK-UP TABLES
Chemical
Radiological
NASA
Correspondence
NEPA Documents
CEQA Documents
Field Sampling Plan SubArea 1
Field Sampling Plan SubArea 2
Field Sampling Plan SubArea 3
Field Sampling Plan SubArea 4
Field Sampling Plan SubArea 5
Field Sampling Plan 6
Data Summary Report
Pipeline Sampling
Soil Treatability Studies
Focused Soil Remedial Action Implementation Plan and Design
NPDES MONITORING DISCHARGE REPORTS
Monitoring Discharge Reports 2010
- Annual Reports
- Quarterly Reports
Monitoring Discharge Reports 2009
- Annual Reports
- Quarterly Reports
Monitoring Discharge Reports 2008
- Annual Reports
- Quarterly Reports
Monitoring Discharge Reports 2007
- Annual Reports
- Quarterly Reports
Monitoring Discharge Reports 2006
- Annual Reports
- Quarterly Reports
Correspondence
OFFSITE INVESTIGATIONS
North Drainage\Mountains Recreation Conservancy Agency (MRCA)
- Reports
- Workplans
- Correspondence
- Photos
Offsite Debris Assessment
- Offsite Presentations
- Offsite Workplans
- Offsite Agency Review Comments
- Offsite Correspondence
Offsite Reports
- Reports
- Correspondence
Orcutt Ranch Soil Sampling
Perchlorate
Bell Canyon
Dayton Canyon
Runkle Canyon
Woolsey Canyon
Brandeis Bardin Institute
- DTSC Technical Memorandum
- Fact Sheet
- Reports
ATSDR
PARENTS AGAINST SANTA SUSANA FIELD LABORATORY ET AL. V. DTSC
Court Documents
PERMIT-RELATED ACTIVITIES
Groundwater Treatment
Permit Modifications
- Permit Appeals
- Permit Modifications
National Pollutant Discharge Elimination System (NPDES) Permit
Areas I & III Draft RCRA Post Closure Permit - September 2015
- Text
- Tables
- Figures
- Appendices
- Correspondence
- Exhibits
Areas I & III Draft RCRA Post Closure Permit - September 2015 Test
- Text
- Exhibits
- Tables
- Figures
- Appendices
- Correspondence
Areas I and III Surface Impoundment Post-Closure Permits (post 2015)
Areas II Surface Impoundment Post-Closure Permits (post 2015)
Areas I, II, and III Surface Impoundment Post-Closure Permits (2014 and prior)
Closure Plan
- Public Comments for RMHF and HWMF Draft Closure Plans and Standard Operating Procedures for Demolition of Facilities in Area IV
- Closure Plan
Thermal Treatment Facility
Radioactive Materials Handling Facility (RMHF)
Hazardous Waste Management Facility (Building 29/133)
PHYSICIANS FOR SOCIAL RESPONSIBILITY ET AL. V. DTSC
Court Documents
PROGRAM ENVIRONMENTAL IMPACT REPORT
Draft
- PDF Files
PROJECT TECHNICAL MEETINGS AND WEEKLY ACTIVITY REPORTS
Project Technical Meetings
Weekly Activity Reports
PUBLIC COMMENT DOCUMENTS
Public Notices
Documents for Review and Comment
Background Documents
PUBLIC INVOLVEMENT
Public Notices
Fact Sheets
Meeting Agendas, Presentations, Etc
- SSFL Risk Assessment Meeting – September 8, 2015
- Meeting Agendas, Presentations, Etc
Meeting Notes
Groundwater U Sessions
- Session 1 - March 8, 2011 - Geology/Hydrogeology
- Session 2 - March 15, 2011 - Contaminant Fate and Transport
- Session 3 - April 5, 2011 - Groundwater Remediation Approaches
- Session 4 - April 28, 2011 - Groundwater Flow at the SSFL
- Session 5 - May 5, 2011 - Contaminant Sources at the SSFL
- Session 6 - May 19, 2011 - Contaminant Fate and Transport at the SSFL
- January 2024 Sessions
- February 20, 2024 Session
- March 12, 2024 Session
- April 4, 2024 Session
- April 6, 2024 Session
Soil Smart Workshop Series
Other Community-related Documents
Community Surveys
- Other Community Surveys
- Annual Community Surveys
Community Updates
Open House - May 2012
QUARTERLY PROGRESS REPORTS
Pre-2016 Joint Quarterly Status Reports
DOE Quarterly Progress Reports
NASA Quarterly Progress Reports from Q1 2011 Forward
Boeing Quarterly Progress Reports from Q1 2016 Forward
RCRA FACILITY INVESTIGATION - GROUNDWATER
3-Dimensional Groundwater Flow Model Report
- 3-Dimensional Groundwater Flow Model Report
Brandeis-Bardin Testing (Off-site well data from 2013 forward can be found in the Quarterly/Annual Report sub-category)
- Brandeis-Bardin Testing
Correspondence
- Correspondence
Faults
Groundwater Data
- Groundwater Data
Groundwater Model
Groundwater Treatment System
- Groundwater Treatment System
Historical Documents
- Historical Documents
Interim Measures
- Agency Review Comments
- Correspondence
- Photos
- Reports
- Workplans
- Technical Memorandum
Offsite
- Offsite
Other Monitoring Reports
Permits - Groundwater Operations and Maintenance
- Permits - Groundwater Operations and Maintenance
Quarterly/Annual Groundwater Reports
- Quarterly Groundwater Reports
- Annual Groundwater Reports
- Correspondence
RFI Reports
- RFI Reports
Seeps and Springs
- Reports/Technical Memoranda
- Correspondence
- Work Plans
Shallow Zone Groundwater Investigation
- Reports
- Work Plans
- Agency Review Comments
- Correspondence
Sitewide Groundwater Remedial Investigation Report
- Complete Draft Sitewide Groundwater Remedial Investigation Report
- Draft Sitewide Groundwater Remedial Investigation Report Text
- Draft Sitewide Groundwater Remedial Investigation Report Figures
- Draft Sitewide Groundwater Remedial Investigation Report Tables
- Draft Sitewide Groundwater Remedial Investigation Report Plates
- Draft Sitewide Groundwater Remedial Investigation Report Appendices
- Draft Sitewide Groundwater Remedial Investigation Report Correspondence
- Draft Conceptual Model Files
- Final RCRA Facility Groundwater Remedial Investigation Report
Sitewide Water Quality Sampling and Analysis Plans
- Correspondence
- Sampling and Analysis Plans
- Agency Review and Comment
- Community Comments
Technical Memorandum
Work Plans
- Site-Wide Groundwater Characterization Work Plan
- Phase 2 Technical Memo
- Other Workplans
- Correspondence
- Agency Review Comments
PFAS Investigation
RCRA FACILITY INVESTIGATION - SOILS
Remedial Investigation Work Plans - NASA
- Correspondence
- Community Comments
- Agency Review Comments
- Work Plans
Group 1A
- Group 1A Agency Review Comments
- Group 1A Community Comments
- Group 1A Correspondence
- Group 1A Historical Documents
- Group 1A Related Reports
- Group 1A RFI Report
- Group 1A Sampling and Analysis Plan
Group 1B (including Area I Burn Pit)
- Group 1B Sampling and Analysis Plan
- Group 1B RFI Report
- Group 1B Historical Documents
- Group 1B Related Reports
- Group 1B Community Comments
- Group 1B Agency Review Comments
- Area I Burn Pit Workplan
- Area I Burn Pit Historical Documents
- Area I Burn Pit Correspondence
- Area I Burn Pit Community Comments
- Area I Burn Pit Agency Review Comments
- Area I Burn Pit Related Reports
- Group 1B Correspondence
Group 2
- Group 2 RFI Report
- Group 2 Historical Documents
- Group 2 Agency Review Comments
- Group 2 Correspondence
- Group 2 Community Comments
- Group 2 Related Reports
Group 3
- Group 3 RFI Report
- Group 3 Historical Documents
- Group 3 Agency Review Comments
- Group 3 Community Comments
- Group 3 Correspondence
- Group 3 Sampling and Analysis Plan (SAP)
- Group 3 Related Reports
Group 4
- Group 4 RFI Report
- Group 4 Sampling and Analysis Plan
- Group 4 Correspondence
- Group 4 Related Reports
- Group 4 Historical Documents
- Group 4 Agency Review Comments
- Group 4 Community Comments
Group 5
- Group 5 RFI Report
- Group 5 Historical Documents
- Group 5 Related Reports
- Group 5 Correspondence
- Group 5 Agency Review Comments
- Group 5 Community Comments
Group 6
- Group 6 RFI Report
- Group 6 Historical Documents
- Group 6 Correspondence
- Group 6 Related Reports
- Group 6 Community Comments
- Group 6 Sampling and Analysis Plan
- Group 6 Sampling and Analysis Plan Community Comments
- Report Addendum NIOSH
- Group 6 Agency Review Comments
Group 7
- Group 7 Agency Review Comments
- Group 7 Community Comments
- Group 7 Correspondence
- Group 7 Historical Documents
- Group 7 Related Reports
- Group 7 RFI Report
- RMHF Agency Review Comments
- RMHF Community Comments
- RMHF Correspondence
- RMHF Historical Documents
- RMHF Related Reports
- RMHF Workplan
- Group 7 Sampling and Analysis Plan
Group 8
- Group 8 RFI Report
- Group 8 Agency Review Comments
- Group 8 Correspondence
- Group 8 Related Reports
- Group 8 Community Comments
- Group 8 Historical Documents
- Group 8 Sampling and Analysis Plan
Group 9
- Group 9 Agency Review Comments
- Group 9 Community Comments
- Group 9 Correspondence
- Group 9 Historical Documents
- Group 9 Related Reports
- Group 9 RFI Report
Group 10
- Group 10 RFI Report
- Group 10 Historical Documents
- Group 10 Correspondence
- Group 10 Related Reports
- Group 10
- Final RFI Reports
Boeing Subarea 5/9 South
- Data Gap Work Plan Addenda
- Draft RFI Reports
- Boeing Subarea 5/9 South
- Final RFI Reports
Boeing Subarea 5/9 North
- Data Gap Work Plan Addenda
- Draft RFI Reports
- Final RFI Reports
- Boeing Subarea 5/9 North
Boeing Subarea 1A Central
- Data Gap Work Plan Addenda
- Draft RFI Reports
- Boeing Subarea 1A Central
- Final RFI Reports
Boeing Subarea 1A South
- Data Gap Work Plan Addenda
- Draft RFI Reports
- Final RFI Reports
Boeing Subarea 1A North
- Draft RFI Reports
- Boeing Subarea 1A North
- Final RFI Reports
Boeing Subarea 1B North
- Draft RFI Reports
- Boeing Subarea 1B North
- Final RFI Reports
Boeing Subarea 1B Southwest
- Draft RFI Reports
- Boeing Subarea 1B Southwest
- Final RFI Reports
Boeing Subarea 1B Southeast
- Data Gap Work Plan Addenda
- Draft RFI Reports
- Final RFI Reports
Building Demolition
- Building Demolition
- Correspondence
Correspondence
- Correspondence
Current Conditions
Data Quality Objectives
Data Validation - HML/Lockhead Reviews
Debris Removal Activities
Draft Workplans
- Draft Workplans
Program Report
- Program Report
- Agency Review Comments
Quality Assurance Project Plan (QAPP)
- Quality Assurance Project Plan (QAPP)
Sitewide Historical Documents
- Sitewide Documents
- Other Historical Documents
Standard Operating Procedures
- Building Feature Evaluation and Sampling
- Onsite Debris Survey
- Boeing Characterization Program
Underground Storage Tanks
- Reports
- Correspondence
Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area
- Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area
- Final RFI Reports
REGULATOR CORRESPONDENCE AND OVERSIGHT
IS&E Order for Area I Burn Pit 5/9/22
- Orders
- Work Plans
- Reports
- Correspondence
- Monthly Summary Reports
IS&E Order for Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range and Overshot Area 3/25/22
- Orders
- Work Plans
- Reports
- Correspondence
- Monthly Summary Reports
IS&E Orders for North Drainage/LOX Debris 11/01/2007
- Orders
- Work Plans
- Correspondence
- Reports
- Photos
Order-Related Workplans
1992 Enforcement Order
Correspondence
Orders
Agreements
Settlement Agreement
RISK ASSESSMENT
Risk Assessment
- Technical Memorandum
- Correspondence
- Vapor Validation Study
- Rural Residential Risk-Based Screening Development
- Standardized Risk Assessment Methodology (SRAM)
- Human and Ecological Risk Division (HERD) Documents
- Agency Review Comments
- Ecological Risk Assessment
Risk Based Screening Levels (RBSLs)
Development of Goals for Soil at Boeing Sites
- 1 RBSLs and Revised Risk Assessment Procedures
- 2 Characterization SLs for Vapor Intrusion
- 3 Soil and Soil Vapor Characterization Levels
- 4 Draft RBSLs
- 5 Soil Characterization Levels
- 6 DTSC Comments on Revised SCLs
- 7 Soil Characterization Levels
- 11 RBSLs
- 12 Chemical Soil Background Data Set
- 13 UTL 95-95 for 2,3,7,8-TCDD TEQ Bird
- 14 Radiological RBSL Calculations
- 8 Soil Characterization Levels for Radionuclides
- 9 Soil Characterization Levels for Radionuclides
- 10 Soil Characterization Levels for Radionuclides
- Legend
Reports
Chatsworth Formation Operable Unit/Groundwater Risk Assessments
- Reports
- Correspondence
- Agency Review Comments
SENATE BILL 990
Correspondence
Reports
SURFACE WATER
Surface Water
WILDFIRES
Wildfires
Document Title:
Use this field to narrow your search by entering a single word from a document title or a portion of a document title. This search field is not case sensitive, but is limited to 250 characters.
Original Publication Date (mm/dd/yyyy):
Use this field to narrow your search by selecting a range of publication dates. Leave the field blank if you're uncertain. If you only know the year, such as 2008, enter '01/01/2008 to 12/31/2008' into the search fields to locate all documents published in 2008.
to
Document Library Search Tips
If your search returns over 200 documents, you may narrow your search by selecting additional criteria, such as a range of publication dates or a document library category.
If you are searching a large document group that has its own index, such as Historical Documents, try searching within the document index. To locate the document index follow the instructions below.
Reset the search function.
Enter "document index" into the Document Title field.
Hit search and pick the document index you're looking for from the list of results.
To search for documents within a document index follow the instructions below.
Open the document index.
Press the CONTROL and F keys at the same time.
In the search field that appears enter a single word or a portion of a title in order from a document title.
Avoid using the following words, because they will be ignored:
single letters or numbers
characters other than the alphabets and numbers
general words such as 'the', 'this', and 'he'
If the search criteria consists of only ignored words, the search will not return any results.
^Top^
This page was last updated on 10/5/2009 | Copyright ©2006. All rights reserved.
All documents posted on this site can be viewed with Adobe Acrobat Reader